RECENT MAJOR PROJECTS INCLUDE:

 

Auraria Student Housing

Denver, CO

 

Design Build 440 Bed student housing facility with High Rise Life Safety, HVAC & Plumbing Systems. Contract Amount: $2,669,149.

 

Boulder & Associates

Boulder, CO

 

22,000 SF office buildout & remodel for Architects office.  Rooftop HVAC units, hot water heating, material recycling, scrap materials & day lighting. Contract Amount: $458,206 / LEED Certified.

 

Brownstone Lofts

Denver, CO

 

Design Assist for 40 unit high-end condominium & mixed use retail complex. HVAC aquatherm system with furnace units & split system DX units & domestic plumbing systems. Contract Amount: $1,258,305.

 

Carbon Valley Recreation Center

Frederick, CO

 

50,000 SF Community Recreation Center with locker rooms, sports courts and 3 pools.  Rooftop VAV and pool dehumidification systems, steam generators and domestic plumbing systems. Contract Amount: $802,914.

 

Community Bank Building

Denver, CO

 

New 3-Story, 35,000 SF, Bank & office space. Systems include evap cooled rooftop units, alternate refrigerants, commissioning plan, recycling, and domestic plumbing systems.   Contract Amount $369,149 / LEED Certified.

 

Country Inn & suites Hotel @ DIA

Denver, CO

 

197 room high rise hotel at DIA Airport. New HVAC & Exhaust systems, boiler system, pool dehumidification & domestic plumbing.   Contract Amount $1,223,581.

 

 

 

Denver Zoo Entry &  Lion Exhibit

Denver, CO

 

New Lion exhibit, animal holding buildings and retail/administration buildings.  HVAC and domestic plumbing systems. Contract Amount: $2,278,203.

 

Hilton Garden Inn

Denver, CO

 

New design build, 12 story building 230 rooms, high rise hotel. With vertical stack heat pumps, fluid coolers, boiler plant kitchen, and domestic plumbing systems. Contract Amount: $3,150,000.

 

Luzenac Pharmaceutical

Centennial, CO

 

Design Build Laboratory build out for 50,000 SF space.  HVAC, Fume hoods, process piping and domestic plumbing systems. Contract Amount: $457,546.

           

 

                       

Merrick & Company

Tenant Finish

Aurora, CO

 

72,000 SF mechanical upgrade and tenant finish New AHU units, new VAV terminals, DDC controls retrofit & plumbing upgrades. Contract Amount: $452,306.

 

Misc Tenant Finish Projects

Denver / Front Range

 

Over $3,000,000 in annual revenue for multiple HVAC & Plbg tenant finish for spaces ranging from 5000 SF to 75,000 SF of office space.

 

Museum of Contemporary Arts

Denver, CO

 

New Museum Bldg project, Evaporative cooled AHU units, Cooling Tower, commissioning, material recycling, radiant floor heating and domestic plumbing systems. Contract Amount: $1,175,000 / LEED GOLD.

 

NIST Central Utility Plant

Boulder, CO

 

40,000 SF Central Utility Plant w/ multiple chillers boiler plant, steam piping & compressed air Domestic plumbing systems. Contract Amount: $2,271,203.

           

 

                       

Pearl Street Retail

Boulder, CO

 

3 Building, 60,000 SF retail complex including rooftop HVAC equipment, waste systems, conventional plumbing systems. Contract Amount: $468,506.

 

Stapleton Medical Office Bldg

Denver, CO

 

55,000 SF office and medical facility, new rooftop VAV units, alternate refrigerants, scrap recycling, day lighting, waste management, commissioning and domestic plumbing system. Contract Amount: $756,820 / LEED Silver.

           

 

                       

St. Elizabeth Ann Seton Church

Fort Collins, CO

 

New Sanctuary and Classroom addition & remodel with rooftop DX equipment, pumps, &domestic plumbing. Contract Amount: $623,815.

 

University Center for Atmospheric Research(UCAR)

Boulder, CO

 

75,000 SF office and research facility, new chiller and boiler central plant. VAV AHU with VFD’s, kitchen systems, compressed air and domestic plumbing system. Contract Amount: $1,756,820.

 

University of Colorado –
Engineering Center HVAC  Upgrades

Boulder, CO

 

Exhaust system upgrade for chemical engineering wing including new roof mounted manifold systems, fume hoods, built up air handler with steam and chilled water. Contract Amount: $648,000.

 

University of Colorado LSTR Laboratory

Boulder, CO

 

80,000 SF research lab and class 10,000 clean room.  Evaporative Custom chiller, built-up AHU units, alternate refrigerants, central boilers, HEPA filtration, DDC controls, and domestic plumbing. Contract Amount: $1,814,602 / LEED equivalent Silver.

 

University of Colorado –
Mechanical Engineering IB60 Cleanroom

Boulder, CO

 

1,500 SF Class 1000 cleanroom build out with new chiller water/steam air handler, chiller water processing skid, and plumbing. Contract Amount: $223,258.

 

University of Colorado –
On-going Standing work orders

Boulder, CO

 

Central Plant revisions and numerous retrofits at Farrand Hall, President’s Residence, Darley Commons, Baker Hall, Kittredge West, College Inn, JILA Labs, etc. Contract Amount: $4,000,000 over last three years.